The Gostynin ring road

smallimg1 smallimg2 smallimg3 smallimg4

Design and construction of environmental protection equipment

 October 2016 Gostyń


 
baner-gostyn
On 14 October 2016 the Consortium of IDS-BUD S.A. and P.P.H.U. EUROMETAL concluded an agreement to perform the contract: “Design and construction of environmental protection equipment – acoustical barriers – located along the national road No. 60 on a section of the Gostynin ring road running from 0+000 km to 8+804 km.”

Investor: General Directorate for National Roads and Motorways, Department in Warsaw

 

gostyn-mapa

Fig. 1. Location of the investment

 

The investment consists in designing, obtaining necessary opinions, agreements and approval of project documentation, building and assessing the effectiveness of acoustical barriers located along the national road 60 on a section of the Gostynin ring road form 0+000 km (existing chainage 42+600) to 8+804 km (existing chainage 52+547).

  

Planned data regarding the acoustical barriers:

 

Barrier

Side of the road

Chainage (from–to)

Barrier height [m]

Barrier type

 

E2

L

2+482

2+631

5

Transparent (translucent) – reflective

 

2+631

3+373

4

Absorptive

 

E3

P

2+475

2+630

5

Mixed – with transparent (translucent)* elements

 
 
 

E4

P

3+494

3+748

5

Transparent

 

E5

L

5+053

5+150

6

Absorptive

 

5+150

5+388

5

Transparent

 

E6

L

5+468

5+668

6

Transparent (translucent) – reflective

 

E7’

P

5+328

5+468

5

Mixed – with transparent (translucent)* elements

 

E11

P

5+440

5+510

6

Mixed – with transparent (translucent)* elements

 

E8

P

8+144

8+660

6

Transparent

 

(*) – up to 30% of transparent (translucent) modules, i.a. in proximity to intersections and entries to premises.

 
Completion deadline:7 months from the date of concluding the agreement
Realizacja: Informatikon